LGH Case Studies

Every LGH case study showcases real-world problem-solving, precision, and performance. From sliding a 536-ton steel bridge into place to lifting turbine generators and positioning priceless museum artifacts, our team thrives on complex challenges. These stories highlight the creativity, equipment, and expertise behind some of North America’s most demanding lifting and rigging projects.

Explore each LGH case study to see how we help customers overcome constraints like low headroom, tight timelines, heavy loads, and unique site conditions—with safe, certified, and custom-engineered solutions.

Case Study: Metropolitan Walters and LGH Tackle the Impossible Over NYC Parkway

Lifting Over Manhattan: LGH’s Rigging Solutions Propel Metropolitan Walters to New Heights   Getting equipment and supplies to a jobsite...

Read More

Case Study: Unforeseen Delays, Unfazed Experts – Riggs Distler’s Power Plant Project

LGH and Riggs Distler Deliver Results, Despite Equipment Delays During Outage Season This case study delves into how Riggs Distler,...

Read More
Sullivan Industrial using an LGH 2T aluminum gantry to install a new boiler.

Case Study: LGH Assists Sullivan Industrial with Boiler Removal and Installation

Boiler Installation: Out With the Old, In With the New This case study examines a challenging project that Sullivan Industrial...

Read More

Case Study: Chiller Rack Install Success with NessCampbell & LGH

CO2 CHILLER RACK INSTALLATION – A TESTIMONY TO AGILITY AND PRECISION   This case study delves into the details of...

Read More
LGH and Golden Gate Airbus Lift at Long Beach Port- from Case Study

Case Study: LGH and Golden Bridge Fast-Track Airbus Transport

LGH RIGGING SOLUTIONS: SECURING A FLIGHT PATH FROM LONG BEACH TO SHANGHAI When it comes to the most complex logistical...

Read More

Case Study: Gate Valve Replacement with Skidding System

LGH RIGGING SOLUTIONS: EFFICIENT GATE VALVE REPLACEMENT IN NEW JERSEY   When it comes to handling heavy, cumbersome equipment in...

Read More

Case Study: J. Haugh Cranes’ Strategic Use of LGH Hydraulic Gantry

Navigating Tight Spaces: J. Haugh Cranes Relies on LGH for Successful Refrigeration Unit Installation LGH Equipment Used (2) 20-ton Hydraulic...

Read More
Sprint Mechanical Case Study - Scarborough Hospital Renovation in Ontario Canada

Case Study: LGH Rigging Solutions for Hospital Renovation

Sprint Mechanical’s Strategic Use of LGH Rigging for Ontario Hospital Renovation LGH Equipment Rented Mod 24 Spreader Beams Mod 50...

Read More