LGH Case Studies
Every LGH case study tells a story of innovation and determination. From sliding a 536T steel bridge section into place, to replacing a hydroelectric turbine generator, to delicately positioning priceless works of art, we thrive on a challenge.
Ready to be inspired? Explore our case studies and see how LGH can elevate your next project to new heights! Your success story starts here.
Case Study: Lifting a Jet
Lifting a Jet onto the Intrepid Sea, Air & Space Museum R. Baker & Son was hired to lift a...
Read More
Case Study: Lifting and Replacing a Coal Transfer Conveyor Tube
Enerfab, Inc. was hired to complete the lifting and replacing of a conveyor tube for a coal transfer facility using rented Modulift®...
Read More
Case Study: Sound Partnership Gives 2+U Office Tower a Solid Foundation
Omega Morgan Crane Service Inc and Apex Steel Inc were tasked with setting the foundation using a single crane and...
Read More
Case Study: Rehabilitating Chicago’s Congress Parkway
REHABILITATING CHICAGO’S CONGRESS PARKWAY Walsh Construction lifts and lowers 112’ bridge leafs on the Congress Parkway Bascule Bridge with rented...
Read More
Case Study: Bayonne Bridge Approaches Project
Case Study: LGH Supports Bayonne Bridge Demolition with Certified Modular Rigging Solutions GCCOM Construction Company Inc. partnered with LGH...
Read More
Case Study: Heating Up Greektown Casino
Dee Cramer lifted a steam boiler atop the Greektown Casino using rented modular spreader bars, shackles, and nylon slings from...
Read More
Case Study: Powerhouse Duct Conversion
Hayes Mechanical installed new ductwork to reverse the flow of gases going through an existing electrostatic precipitator utilizing air chain...
Read More
Case Study: Creative Use of Bull Rigging to Replace an Attemperator
Creative Use of Bull Rigging to Replace an Attemperator Ontario-based contractor WSN Construction was called upon to perform a replacement...
Read More
Case Study: Air-Cooled Chiller Install With Double CMOD Setup
Overcoming Tight Headroom Restrictions: Air-Cooled Chiller Install With Double CMOD Setup LGH was called upon to provide equipment for a...
Read More
Case Study: Mechanical Adjustments Crucial in CMOD Install of Air Handlers at Salk Hall
Talk About a Tight Fit: Mechanical Adjustments Crucial in CMOD Install of Air Handlers at Salk Hall LGH recently...
Read More