Case Study: Lifting a Jet

Lifting a Jet onto the Intrepid Sea, Air & Space Museum R. Baker & Son was hired to lift a...

Read More

Case Study: Lifting and Replacing a Coal Transfer Conveyor Tube

Enerfab, Inc. was hired to complete the lifting and replacing of a conveyor tube for a coal transfer facility using rented Modulift®...

Read More

Case Study: Sound Partnership Gives 2+U Office Tower a Solid Foundation

Omega Morgan Crane Service Inc and Apex Steel Inc were tasked with setting the foundation using a single crane and...

Read More

Case Study: Rehabilitating Chicago’s Congress Parkway

REHABILITATING CHICAGO’S CONGRESS PARKWAY Walsh Construction lifts and lowers 112’ bridge leafs on the Congress Parkway Bascule Bridge with rented...

Read More

Case Study: Bayonne Bridge Approaches Project

Case Study: LGH Supports Bayonne Bridge Demolition with Certified Modular Rigging Solutions   GCCOM Construction Company Inc. partnered with LGH...

Read More

Case Study: Heating Up Greektown Casino

Dee Cramer lifted a steam boiler atop the Greektown Casino using rented modular spreader bars, shackles, and nylon slings from...

Read More

Case Study: Powerhouse Duct Conversion

Hayes Mechanical installed new ductwork to reverse the flow of gases going through an existing electrostatic precipitator utilizing air chain...

Read More

Case Study: Creative Use of Bull Rigging to Replace an Attemperator

Creative Use of Bull Rigging to Replace an Attemperator Ontario-based contractor WSN Construction was called upon to perform a replacement...

Read More

Case Study: Air-Cooled Chiller Install With Double CMOD Setup

Overcoming Tight Headroom Restrictions: Air-Cooled Chiller Install With Double CMOD Setup LGH was called upon to provide equipment for a...

Read More

Case Study: Mechanical Adjustments Crucial in CMOD Install of Air Handlers at Salk Hall

Talk About a Tight Fit: Mechanical Adjustments Crucial in CMOD Install of Air Handlers at Salk Hall   LGH recently...